Business Systems Strategist
I turn operational complexity into business systems that run in production.
Industrial Civil Engineer with more than 15 years in management control, business intelligence, ERP integration and process automation. I work where business rules, data and operational reality meet — and stay accountable through production.
In production7 systems39 reports22 users5 access rolesMare Blu Tuna Farm, Maltasince Jul 2023

Selected results
- Basis
- Mare Blu — web, desktop and Android, on two PostgreSQL databases
- Basis
- Broadspectrum — three days to one hour, across 20 contracts
- Basis
- Mare Blu — independent estimate for procuring the delivered scope externally
- Frame
- Avoided replacement cost, not a cash saving.
- Basis
- Broadspectrum — 2014 to 2016
- Frame
- Company-level outcome delivered by the whole organisation. The management-control workstream supported it.
Case studies
From paper and disconnected spreadsheets to seven integrated production systems
Mare Blu Tuna Farm Ltd — Aquaculture — Malta
Administration Officer · Functional scope: Business Systems & Digital Transformation Lead · Jul 2023 – Present
An operation whose regulatory and cost truth lived on paper and in spreadsheets nobody could reconcile — rebuilt as one operational record.
7systems39reports22users5rolesRebuilding contract profitability visibility across 20 mining-service contracts
Ferrovial (Broadspectrum) — Mining services — Chile
Management Control Leader · Reporting to CFO and CEO · May 2014 – Apr 2018
A business losing money without being able to say where. The fix was not more reporting — it was changing the unit at which the business was measured.
20contracts7clients99%faster close€100Kcost avoidedStanding up an institution's first business intelligence capabilityShort case
Fundación Educacional Escondida (CEIM) — Industrial and mining technical training — Chile
Director of Planning and Management Control · Partnering directly with executive leadership · Apr 2019 – Dec 2022
A national industrial and mining training institution with no reporting platform, a multi-million budget to plan and control, and in-house satellite platforms awaiting ERP integration. Built the capability, then the systems.
5functions servedSAP B1implementation6 mo.to go-live